There will be electrical maintenance conducted at the Piedmont Court building between 5/16/2022 7:00AM to 5/17/2022 8:00PM. Cruzio engineers will be supplying backup power at the start of this maintenance which will cause a brief interruption during the cutover on Monday morning, and once more when the equipment is switched back to mains on Tuesday evening. This includes connections at the Piedmont Court building itself, as well as a handful of Wireless Pro connections downstream from the building. No further downtime is anticipated.