On 9/12/2022 between 8:00AM to 11:00AM the Piedmont Court will be conducting electrical tests in their building. Cruzio engineers will be deploying a generator to provide power to our equipment during this window. There will be a brief interruption as we cut to the generator, and then another brief interruption once we cut back to main power.